top of page
NEID Basin Sewer Separation:
Field Verification
The Northeast Industrial District (NEID) project area comprised approximately 560 acres of light industrial/commercial land use. The project goal was to eliminate combined sewer overflows by separating sanitary from storm water flow.
​
KEY ELEMENTS:
-
EAE provided two field teams for verification of aerial surveying and utility data.
-
EAE's intense effort in field verification helped to meet the project's hard deadline for construction.
-
The presence and locations of manholes, inlet structures, fire hydrants, curbs and drives, vegetation, sidewalks, and other site features were verified to identify possible obstacles to construction.
bottom of page