Blue River WWTP Biosolids Facility
CLIENT
Black & Veatch
GENERAL CONTRACTOR
​Goodwin Brothers Construction Co.​
​
EAE PROJECT MANAGER
Doug Swift
EAE KEY PERSONNEL
Doug Swift
Martin DiNitto
​
HIGHLIGHTS
-
Largest construction project KC Water has undertaken.
-
First THP (thermal hydrolysis process) plant built in the Midwest.
-
Blend of multiple building materials; pre-engineered metal building sitting on top of a cast-in-place concrete structure with a brick veneer.
​

PROJECT DESCRIPTION
EAE was subcontracted by Black & Veatch to act as the Architect-of-Record to provide professional architectural design services and construction administration services for the Blue River WWTP Biosolids Facility project. The project was a design build project with Goodwin Brothers being the General Contractor, Black & Veatch were the prime engineers and EAE as the Architect-of-Record. The goal of the project was to design improvements to the solids management processes to meet the anticipated solids capacity, reliability, and regulatory requirements through 2035. The Blue River WWTP is Kansas City’s largest wastewater treatment plant. It treats approximately 75 million gallons of wastewater per day and processes and cleans approximately 98 percent of the solid waste materials for Kansas City, Missouri.