top of page

ARCHITECTURAL SERVICES
FEATURED PROJECT

Blue River WWTP Biosolids Facility

 

 

 

 

 

 

 

CLIENT

Black & Veatch

 

GENERAL CONTRACTOR

​Goodwin Brothers Construction Co.​

​

EAE PROJECT MANAGER

Doug Swift

 

EAE KEY PERSONNEL

Doug Swift

Martin DiNitto

​

HIGHLIGHTS

  • Largest construction project KC Water has undertaken.

  • First THP (thermal hydrolysis process) plant built in the Midwest. 

  • Blend of multiple building materials; pre-engineered metal building sitting on top of a cast-in-place concrete structure with a brick veneer. 

 

​

PROJECT DESCRIPTION

EAE was subcontracted by Black & Veatch to act as the Architect-of-Record to provide professional architectural design services and construction administration services for the Blue River WWTP Biosolids Facility project. The project was a design build project with Goodwin Brothers being the General Contractor, Black & Veatch were the prime engineers and EAE as the Architect-of-Record. The goal of the project was to design improvements to the solids management processes to meet the anticipated solids capacity, reliability, and regulatory requirements through 2035. The Blue River WWTP is Kansas City’s largest wastewater treatment plant. It treats approximately 75 million gallons of wastewater per day and processes and cleans approximately 98 percent of the solid waste materials for Kansas City, Missouri.

ENVIRONMENTAL ADVISORS & ENGINEERS, INC. 

ACCOUNTS PAYABLE/ RECEIVABLE:

 

25207 West 98th Street

Lenexa, KS 66227

Attn: Robert Bens

HEADQUARTERS:

 

19211 West 64th Terrace

Shawnee, KS 66218

EAE LOCATIONS:​

​

Kansas City Metro Area

(various KS & MO locations)

Boston/Marshfield Hills, MA

Fort Collins, CO

Fort Garland, CO

Springfield, MO

St. Louis, MO

Godfrey, IL

Loganton, PA

​

QUICK LINKS

​

Services

Careers

Privacy Policy

Terms of Use

​

  • Instagram
  • Facebook
  • LinkedIn

© 2022 Environmental Advisors and Engineers, Inc.  Site design by Graphic Edge KC.

bottom of page